Upgrading nuclear power plant equipment, repairing or performing complex work requires delivery of equipment, materials and spare parts.
In 2017, during calibrating (adjusting) a SAPHIR self-test card (SSP-01) at the Novovoronezh NPP, we transported the self-test card to the manufacturer's site – AREVA GmbH, Germany, and after the calibration, we returned this equipment back to the Novovoronezh NPP.
In 2016, we supplied spare parts for diesel generators to the Kola NPP.
In 2016-2017, we performed a set of works: Supply of equipment, including the development of detail engineering design documentation, construction and installation works, commissioning and setup according to the assignment: "Upgrade of excitation systems of turbine generators of Stage 2 by replacing automatic excitation regulators." When performing these works, we supplied four cabinets with automatic control devices for turbine generators of Stage 2 to the Kola NPP.
In 2014, we supplied equipment to the Kola NPP to upgrade the additional emergency feed system for steam generators consisting in equipping sheds near the denitrification plant and SK-2 buildings.